Regulatory Compliance: Designed under ISO 14644 standards and international regulations.
Cutting-Edge Engineering: HEPA/ULPA filtration systems and high-precision climate control.
Turnkey Solutions: From conceptualization and design to final installation and validation.
Specialized wall paneling, conductive flooring, and walkable ceilings.
Differential pressure control, temperature, and relative humidity management.
Filter integrity testing and particle count certification.
Water heater repair & replacement,
Tankless water heater repair & replacement,
Gas line repair, Water leak detection & repair,
Repiping services
A/C Install, A/C Maintenance & Replacement,
Attic insulation, Heating system inspection/maintenance,
UV & HEPA air filtration
Electric panel repair/installation,
Smoke & carbon monoxide detectors,
Wiring & Rewiring, Circuit breakers, fuses replacement, GFCI outlets installation
COMPREHENSIVE CONTROLLED ENVIRONMENT SOLUTIONS FOR THE PHARMACEUTICAL,
ELECTRONICS, AND BIOTECH INDUSTRIES.
● Build the plenum structure about the cleanroom according to design specifications
● Seal all joints and penetrations to ensure airtight performance
● Apply spray insulation within the plenum to improve thermal efficiency and eviroment
control.
● Removal of existing equipment to allow safe and unobstructed access.
● Installation of temporary containment barriers to prevent dust and cross-contamination
during construction.
● Perform leak detection using specialized equipment to identify moisture within the slab.
● If necessary, selectively open wall areas to inspect plumbing lines and locate the
source.
● Seal all exterior cracks and vulnerable areas to prevent future water intrusion.
● Prepare all wall surfaces to a cleanroom-ready finish.
● Apply epoxy coating system to meet hygiene and compliance standards.
● Prepare existing flooring surface.
● Install epoxy flooring system for durability, cleanability, and compliance.
● Install new 3.5-ton HVAC system.
● Install 100-pint dehumidifier for proper humidity control.
● Ensure stable environmental conditions for cleanroom operation.
● Removal of existing Fan Filter Units, Installation of. (3) roomside replaceable Fan Filter
Units.
● Installation of negative pressure gauge.
● Relocate thermostat to ensure accurate temperature control and system performance.
● Perform detailed cleaning of all areas.
● Prepare the space for inspection and certification.
Assessment: Analysis of industry-specific requirements.
Engineering: Development of blueprints and technical specifications.
Execution: Installation by highly qualified personnel.
Certification: Handover of documentation and operational validation.
Sterile areas and biosafety laboratories.
Strict control of particulate contamination.
High-safety processing zones and food grade environments.
SPECIALIZED AIR CONDITIONING MAINTENANCE
Preventive Maintenance services include:
(2) Annual chemical cleanings and (3) quarterly inspections.
● Full system inspection and diagnostics
● Quarterly air filter maintenance
● Coil cleaning (including two annual chemical cleanings)
● Electrical component inspection
● Refrigerant level checks
● Blower and motor maintenance
● Condensate drain cleaning
● Optional ductwork inspection
● System performance testing
● Detailed service reports after each visit